South Water and Main Streets Resurfacing

S. Water and Main 1 (PDF)

Portions of both downtown streets will be resurfaced in 2022; South Water from St. Rt. 59 to Main, and Main from Mantua to just west of Willow. Work will include milling, resurfacing, curb repair, handicap ramps, catch basin repairs and new pavement markings. 

Estimated cost is $1 million, with the majority funded through a grant from Akron Metropolitan Area Transportation Study (AMATS).

Work is expected to be completed in Summer 2022.